<?xml version="1.0" encoding="ISO-8859-1"?>
<rdf:RDF xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:ref="http://purl.org/rss/1.0/modules/reference/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns="http://purl.org/rss/1.0/">
	<channel rdf:about="http://halfabrain.net/rss.rdf">
		<title>Half-a-brain - A twisted journey through the mind</title>
		<link>http://halfabrain.net/index.php</link>
		<description><![CDATA[Designed and maintained by thinQ Smart - Hosted by The B-25 Group ]]></description>
		<items>
			<rdf:Seq>
				<rdf:li resource="http://halfabrain.net/index.php?entry=entry091031-012209" />
			</rdf:Seq>
		</items>
	</channel>
	<item rdf:about="http://halfabrain.net/index.php?entry=entry091031-012209">
		<title>Long-term Solution For Illegal Immigration</title>
		<link>http://halfabrain.net/index.php?entry=entry091031-012209</link>
		<description><![CDATA[Problem: Insufficient employment opportunities for Mexician citizens in Mexico<br /><br />Proposal: Build a trans-oceanic canal across the Isthmus of Tehuantepec in southern Mexico.<br /><br />Background:<br /><br />The isthmus is 125 miles across at its narrowest point from gulf to gulf. The elevation ranges to 735 feet. A project of this size could keep a sizable workforce busy for several years. If combined with an overall project of developing manufacturing and high-grade port facilities on both the Pacific and Atlantic coasts Mexico could potentially begin to support its own population. A canal could also provide Mexico with a measure of protection from free-flowing refugees from the south.<br /><br />Oil production currently exists in this area in and around the Bay of Campeche. However, production is dropping. Some areas peaked as early as 2006 (Cantarell) and the latest figure I have seen for any area to date is 2010 (Ku-Maloob-Zaap). Unless the northern fields (Aqua Fria and Chicontopec), which peak much later, are able to pick up the slack, there will be fewer jobs available for skilled Mexican workers.<br /><br />Project:<br /><br />Phase I:<br /><br />1. Enhance ports on both coasts<br />2. Build multi-track trans-oceanic railway along the proposed route of the canal<br />3. Build trans-oceanic pipeline<br />4. Planning for up-stream ports, facilities and towns<br /><br />Phase II:<br />1. Canal construction<br />2. Up-stream construction<br /><br />Green Off-set:<br /><br />Any project such as this has great potential for negative impact to the environment. All-phases of the project should take the environment into account. Additionally, large set-asides of land should be acquired and put in trust in perpetuity. These set-asides should be made in each area effected; mountains, marshes, etc.<br /><br />Benefits to the U.S.:<br /><br />1. Decreased border pressure from Mexican citizens seeking work<br />2. Decreased need for economic aid to Mexico<br />3. Decreased cost of shipping goods to/from trans-oceanic destinations<br />4. Decreased shipping time to/from trans-oceanic destinations<br />]]></description>
	</item>
</rdf:RDF>
